13 people missing in hydropower plant: Dangerous landslide, inaccessible locale
According to the Front-line Command Department, 30 people missing in connection with the landslides at Rao Trang 3 hydropower plant in the central province of Thua Thien-Hue due to serious landslide, the rescue work is underway with maximum efforts of finding and rescuing.
Functional forces clear the road to access the scene of accident. (Photo: VTC)
On the evening of October 13, at the Steering Committee of the Front-line Command Department located at the headquarters of the People's Committee of Phong Xuan commune, Phong Dien district (Thua Thien-Hue), Minister of Agriculture and Rural Development Nguyen Xuan Cuong, and Lt. Gen. Nguyen Tan Cuong - Deputy Minister of Defense met with leaders of Thua Thien-Hue province, the Military Region 4 to implement the next plans to soon approach the scene of the landslide that previously caused the missing of 13 officers and soldiers.
It is known that on the 2,5-kilometer road from the communication site to the ranger of sub-area 67 - where the accident happened exist 3 serious landslides.
Vehicles are mobilized to open the route from the center of Phong Xuan commune, Phong Dien district, Thua Thien-Hue province to the Rao Trang 3 hydropower area. (Photo: VTC)
The rescue team worked continuously on October 13 to release hundred tons of mud and rock. (Photo: VTC)
Due to serious erosion, rescue vehicles could not reach the scene. (Photo: VTC)
The leader of Thua Thien-Hue People's Committee said that due to the dense foggy weather conditions in the area, on the evening of October 13, the rescue force temporarily stopped the mission to ensure safety. It is expected that tomorrow (October 14), the rescue team can clear the landslides to reach the scene of the accident.
The Steering Committee has built up a detailed plan to find the missing people. The most professional forces will work with people who have great knowledge of the local terrain to approach the scene.
Soil and rock bury the road to Rao Trang 4 hydropower plant. (Photo: VTC)
Stone completely covered the road to the area of accident. (Photo: VTC)
The Steering Committee requires the search process to ensure smooth communication between the forces involved, heading towards the area of hydropower Rao Trang 3, Rao Trang 4 and A Lin B2. At the same time, functional units shall prepare vehicles and mobile forces to rescue people who stuck in isolated areas.
At 9:00 p.m. on October 13, the area of Phong Xuan commune still had heavy rain, and the work of approaching the accident scene had to be halted. (Photo: VTC)
Fast flowing flood water makes it dangerous for the forces involved in search and rescue when approaching the scene of the landslide. (Photo: VTC)
At 22:00 on October 13, the ambulance was still on duty. (Photo: VTC)
The heavy flooding in Ha Giang Province has caused five people including three children died, two injured, and the property losses estimated at 80 billion ...
More than 27,000 children have benefited from education support through Phase 3 (2022–2025) of the project “Improving the Quality of Education for Disadvantaged Children in Vietnam,” jointly implemented by Save the Children and the Department of Teachers and Education Administrators under the Ministry of Education and Training (MOET). The results were announced at a closing and knowledge-sharing event held on April 16 in Hanoi.
Reproductive health is not just a personal matter—it is a foundation for the sustainable development of society. In Vietnam, Save the Children has been driving positive change through projects aimed at raising awareness, improving knowledge, promoting behavioral change, and enhancing reproductive health services. These efforts are helping to build a healthier, more confident generation of young people.
President of the Chile-Vietnam Friendship Association, Abarzua, emphasized that Vietnam not only achieved independence and national reunification but also demonstrated to the world the importance of national unity.
Not just a place for learning, school can also become a safe and loving home—a place where students are listened to, understood, and supported through emotional challenges. The Psychological Counseling Room model implemented by Save the Children (SCI) is a clear testament to this role.
Beyond providing material resources and financial support of up to VND 5 billion, Number One partners with young talents to help them develop their projects over the long term following the 'Ben Dam Me' (Enduring Passion) award. This commitment reflects the brand's unwavering spirit of empowering the youth to overcome limits and achieve breakthroughs.
Zhi Shan Foundation, in collaboration with the Quang Ngai Provincial Children's Protection Fund, held a signing ceremony for the 2025 cooperation agreement on April 4. The event marked the donation of equipment for five libraries and bookshelves for various schools across the province.