French Experts Work On Long Bien Bridge Restoration Project

Experts from Artelia, a French design company specializing in engineering, project management, and consulting services, have arrived in Vietnam to work with stakeholders and conduct a preliminary survey of the 122-year-old Long Bien Bridge for a restoration project.
November 10, 2024 | 00:04
Stranded in Vietnam, French tourist sells street food to earn living during Covid-19
Searching for One's Mother While Sick: The Story of a Daring French-Vietnamese Woman

At the end of 2023, the French government decided to grant Hanoi a non-refundable aid of over EUR700,000 to conduct a feasibility study for the renovation of the Long Bien Bridge. Since mid-October, the project has officially commenced with initial preliminary surveys.

Works on the bridge, the iconic French construction in the heart of Hanoi, began in 1899 and when completed in 1903 it was named after Paul Doumer, the French Governor General of Indochina.

The bridge has deteriorated after more than 120 years in use, with many components needing replacement. The degradation over time has affected and restricted the flow of vehicles across the bridge, and impacted the urban landscape of the surrounding area.

French Experts Work On Long Bien Bridge Restoration Project
Experts from Artelia make a field trip to Hanoi to survey the Long Bien Bridge. (Photo: Artelia Vietnam)

It now retains only 9 spans on the Hanoi side and 3.5 spans on the Gia Lam side in its original form. The other spans have all been replaced.

In mid-October,2024, the first group of French experts, in collaboration with consulting units and stakeholders from the Hanoi Department of Transport, conducted preliminary evaluation surveys.

“After coordinating with the French experts and relevant units, we have just submitted the project to the municipal Department of Planning and Investment, and the municipal People’s Committee for consideration and approval,” said Phan Truong Thanh, head of the Financial Planning Division at the Hanoi Department of Transport.

According to the official, the technical assistance project funded by France will be divided into three components. In the first phase, the stakeholders will conduct a detailed overall survey of the structure and collect data to ensure traffic safety in the short term.

French Experts Work On Long Bien Bridge Restoration Project
The Long Bien Bridge, the iconic French construction in the heart of Hanoi, has deteriorated over time. Photo: VOV

In the second phase, they will assess the structural integrity of the bridge to propose appropriate renovation methods and solutions. They will then study the potential uses of the bridge in the future, particularly in the context of establishing a new railway network for the current North-South railway line.

The survey work is scheduled to take place over three months, and the entire project is expected to be completed by September 2025.

Thanh said that the Hanoi Department of Transport has emphasized the preservation of the bridge's cultural and historical values in addition to ensuring traffic safety.

Vietnam, Germany Share Experience in Developing Cinema Industry Vietnam, Germany Share Experience in Developing Cinema Industry

Sharing among colleagues from different film industries at the workshop within the 7th Hanoi International Film Festival 2024 (HANIFF VII), helps filmmakers better understand the ...

Water Puppet Show To Be The Highlight of Vietnam Day in Brazil Water Puppet Show To Be The Highlight of Vietnam Day in Brazil

The “Vietnam Days Abroad 2024” programme will take place in Brazil

Charlotte Pho